Obuasi

Obuasi

Highlights

  • Goldcoast Consolidated Minerals Limited has drilled 129 diamond drill holes for a total of 27,883 metres ranging in length  up to 602 metres and averaging approximately 200 metres
  • Drilling has lightly tested targets in eight general areas, with more than 85% of the drilling in the western half of the property
  • The presence of an extensive gold system is illustrated by the fact that anomalous gold intercepts appear at nearly every prospect tested via drilling across the property
  • Technical interpretation of data generated by these programs identify mineralization processes consistent with that observed at the neighbouring Obuasi Mine
  • Obuasi style mineralization appears on Goldcoast Consolidated Minerals Limited’s ground in multiple occurrences across the property from a variety of geological and structural settings
  • Recent data compilation and reanalysis conducted by Goldcoast Consolidated Minerals Limited have identified two primary target areas in the western half of the property which will be subject to future drill testing, including:
    1. The Obuasi Targets, an extension of the deposit host geology and related structures from the Obuasi Mine into the western edge of Goldcoast Consolidated Minerals Limited’s project area; and
    2. The NGA (North Government Area) Targets along and close to the main Birimian / Tarkwaian contact, including one prospect on which Goldcoast Consolidated Minerals Limited returned two high grade drill intercepts of 1m of 24.50 g/t gold and 2m of 11.28 g/t gold, with very limited drill follow up

Ownership

  • 100% owned
  • 284 square kilometres on the Ashanti Gold Belt